Product features
1 / 8
Single Needle, Drop Feed, Zig-Zag, Lockstitch Machine
With: Horizontal Axis Transverse Rotary Hook, Reverse Feed, Combination Zig-Zag and Straight Stitcher
Specifications
| Number of Needles | 1 (Single) |
|---|---|
| Feeding Mechanism | Needle Feed |
| Workspace | Standard Workspace |
| Standard or Full Function | Standard Functions |
| Speed, Max (S.P.M.) | Zig-Zag 2700, Straight 3000 |
| Clearance Under Presser Foot | 15/64" (6mm) |
| Stitch Length | 5 s.p.i. (5mm) |
| Work Space | 10" (258mm) |
| Needle | 16 x 95 |
| Bobbin | Metal B75, Pre-wound L |
| Bed Size | 7" x 18 7/8" (178mm x 480mm) |
| Needle Bar Stroke | 1 11/32" (34mm) |
| Hook | B-70 |
| Zig-Zag Stitch Width | 3/8" (9.5mm) |
Catalogue
The Consew 199R-2A-1 documents Consew publishes, on their own site. They open in a new tab.
Open the catalogue (PDF)Open the instruction manual (PDF)Open the parts book (PDF)
And the catalogues Consew publishes for their whole range.
The file is published and updated by the manufacturer; it is not copied here, so nobody downloads an outdated version.
Product information, photographs and specifications: Consew. No prices or stock here: ask us and we will get back to you.
Other zig-zag models
- Consew 146RB-1A-1
- Consew 146RB-1A-1WS
- Consew 146RB-1A-2
- Consew 146RB-2A-1
- Consew 146RB-2A-2
- Consew 146RB-3A-1
- Consew 146RB-3A-2
- Consew 146RBL-1A-1
- Consew 146RBL-2A-1
- Consew 146RBL-3A-1
- Consew 199R-1A-1
- Consew 199R-3A-1
- Consew 199RB-1A-1
- Consew 199RB-1A-2
- Consew 199RB-2A-1
- Consew 199RB-2A-2
- Consew 199RB-3A-1
- Consew 199RB-3A-2
- Consew 199RBL-1A-1
- Consew 199RBL-2A-1
- Consew 199RBL-3A-1
- Consew 2040-DSM-E
- Consew 366-30
- Consew 366-30P
- Consew 5457RB-1
- Consew 5457RB-7DD-DSM
- Consew 5457RB-DD
- Consew 722E-1
- Consew CN2053R-1A
- Consew CN2053R-2A
- Consew CN2053R-DD
- Consew CN2073R-DSM
- Consew CN2093R
- Consew CN2093R-DD
- Consew P1146RB-1A-7DD
- Consew P1199RB-1A-7DD
- Consew SKZ-6R
- Consew SKZ-6R-3
Tell us the operation you need to solve and we will reply with the right configuration and the lead time.








